PLOT 25 – K1 & K2 – Belgrade Waterfront – External Lighting Works

On the Belgrade Waterfront project (PLOT 25 – buildings K1 and K2), we successfully completed electrical works on the external lighting installations, in accordance with the project technical documentation and the investor’s requirements.

The works included the complete installation, supply, installation and connection of the external lighting system, with the aim of providing functional, energy-efficient and aesthetically integrated illumination of the area.

The project included:

  • laying of cables and construction of cable routes
  • installation of lighting poles and lighting fixtures
  • connection and commissioning of the lighting system
  • installation of control and distribution elements
  • testing of the system’s functionality and proper operation

All works were carried out in accordance with applicable standards, ensuring a high level of quality and compliance with the defined deadlines.