PLOT 25 – K1 & K2 – Belgrade Waterfront – External Lighting Works

At the Belgrade Waterfront (PLOT 25 – buildings K1 & K2) project, we successfully completed electrical works on the external lighting system, in accordance with the design documentation and investor requirements.

The scope included full installation and connection of the external lighting system, ensuring functional, energy-efficient, and aesthetically aligned illumination of the area.

The project included:

  • cable laying and installation of cable routes
  • installation of poles and lighting fixtures
  • connection and commissioning of the lighting system
  • installation of control and distribution components
  • testing of system functionality and performance

All works were carried out in compliance with applicable standards, ensuring high quality and adherence to project deadlines.