
Užice Museum – Electrical Works
At the Narodni muzej Užice project, we successfully completed full electrical installation works in accordance with the highest technical standards and investor requirements.
The scope included execution of both high- and low-voltage systems, covering power distribution, lighting installation, cabling, as well as installation and connection of complete electrical equipment. Special attention was given to system reliability, energy efficiency, and facility safety.
The project included:
- complete electrical power infrastructure
- indoor and outdoor lighting systems
- power distribution and energy management
- low-voltage installations
- grounding and lightning protection systems
All works were carried out in compliance with applicable standards, meeting deadlines and ensuring a high level of quality.
