
PRO TEAM
For the needs of the Logistics Center with a total area of 4,300 m², Sof Elektro 2009 d.o.o. carried out the complete installation of low-voltage power and extra-low-voltage systems, as well as outdoor lighting, including the design, supply, and connection of electrical cabinets.




